top of page

Groundwater Works Projects in Pictures

  • Technician from Groundwater Works conducting borehole survey.

    Groundwater Works Kenya's Hydrogeological Survey Project in Simat Village, Kapsaret

    Electrical resistivity survey mapped subsurface formations to 150m and pinpointed a productive aquifer zone before any drilling began. 
    📍 Uasin Gishu County · 💧 Est. yield: 3–5 m³/hr

  • A team of water engineers and hydrogeologists conducting pump installation on a site.

    Borehole Drilling in Mtepeni Village, Kilifi

    Drilled to ~60m into coastal aquifer formations, cased and developed for long-term structural integrity. 
    📍 Kilifi County · 💧 Tested yield: 2-4 m³/hr

  • Geologist monitoring how groundwater works at a drilling site.

    Independent Drilling Supervision in Mikomani Village, Makueni

    Full technical oversight of depth, casing, gravel packing, and well development by a licensed hydrogeologist. 
    📍 Makueni County · 💧 Tested yield: 2-3 m³/hr at ~130m depth

  • Groundwater works team testing a water pump system

    Test Pumping in Saikeri Village, Kajiado

    Continuous discharge and drawdown monitoring determined the borehole's safe abstraction rate and long-term aquifer performance. 
    📍 Kajiado County · 📊 Sustainable yield confirmed

  • Workers installing a pump for groundwater works.

    Pump Installation in Nuu Ward, Kitui

    Submersible pump installed with HDPE rising main, control panel connection, and full operational testing. 
    📍 Kitui County · ⚙️ System verified and commissioned

  • Workers on scaffolding during groundwater works construction.

    Elevated Water Tank in Mashambani, Bungoma

    Reinforced concrete storage tank built to maintain reliable water pressure for community distribution. 
    📍 Bungoma County · 🏗️ Serving homes, schools & farms

bottom of page