Groundwater Works Projects in Pictures

Groundwater Works Kenya's Hydrogeological Survey Project in Simat Village, Kapsaret
Electrical resistivity survey mapped subsurface formations to 150m and pinpointed a productive aquifer zone before any drilling began.
📍 Uasin Gishu County · 💧 Est. yield: 3–5 m³/hr
Borehole Drilling in Mtepeni Village, Kilifi
Drilled to ~60m into coastal aquifer formations, cased and developed for long-term structural integrity.
📍 Kilifi County · 💧 Tested yield: 2-4 m³/hr
Independent Drilling Supervision in Mikomani Village, Makueni
Full technical oversight of depth, casing, gravel packing, and well development by a licensed hydrogeologist.
📍 Makueni County · 💧 Tested yield: 2-3 m³/hr at ~130m depth
Test Pumping in Saikeri Village, Kajiado
Continuous discharge and drawdown monitoring determined the borehole's safe abstraction rate and long-term aquifer performance.
📍 Kajiado County · 📊 Sustainable yield confirmed
Pump Installation in Nuu Ward, Kitui
Submersible pump installed with HDPE rising main, control panel connection, and full operational testing.
📍 Kitui County · ⚙️ System verified and commissioned
Elevated Water Tank in Mashambani, Bungoma
Reinforced concrete storage tank built to maintain reliable water pressure for community distribution.
📍 Bungoma County · 🏗️ Serving homes, schools & farms